News

Taiwan-New Stipulations for Changhua Offshore Wind Farm

28 July 2021 No.1130
Download PDF(1,289KB)

We have received the following information from our local correspondent in Taiwan, Taiwan Maritime Services Ltd.

 

To ensure the navigation safety in Changhua Offshore Wind Farm located off Taichung and Mailiao port, Taiwan, new stipulations in the Pre-Arrival Notification (PAN) are to be enforced from 26 October 2021. All ships due to pass through the designated areas will be required to comply with the regulations including submission of a pre-arrival notice in the provided form to the authority, failing which fines up to NTD500,000 may be imposed.

 

Please refer to the location of The Changhua Wind Farm as shown in the below diagram provided by the local correspondent.

 

 

For further details, please refer to the attached notice issued by the local correspondent.